I-5/SR 18/SR 161 Interchange Improvements: WSDOT PHD Internal Reviews

Fain Environmental is performing internal WSDOT PHD reviews for nine fish passage barriers associated with the I-5/SR 18/SR 161 interchange improvements. The Fain Environmental team was specifically selected for these reviews to ensure that the maximum possible benefit to aquatic habitat is being considered. Our team reviewed and edited all PHD sections with special attention paid to large wood placement plan sheets, water crossing design decisions, and geomorphic assessment conclusions for all nine fish passage barriers.

I-5/SR 18/SR 161 Interchange Improvements: WSDOT PHD Internal Reviews
I-5/SR 18/SR 161 Interchange Improvements: WSDOT PHD Internal Reviews

Location: King County, Washington

WRIA 10: Puyallup – White

Owner: WSDOT

Year: 2023 to present

Roles

  • Culvert Replacement
  • Geomorphic Assessment
  • Large wood design