Skip to content

Temporary Stream Diversion Plan for E.Smith Rd Pavement Rehabilitation Project

Fain Environmental and Impact Design prepared a temporary stream diversion plan for the E. Smith Rd Pavement Rehabilitation Project. Our team prepared and provided a technical review for a Stream Diversion Plan for Granite on a short timeline. Fain Environmental completed an analysis of flow through the proposed pipe and informed Granite on minimum pipe size.

Location: Whatcom County, Washington

WRIA 1: Nooksack

Owner: Granite Construction

Year: 2021

Roles

  • TemporaryStream Diversion Plan
  • Hydrologic Assessment

Service Areas

Fish Passage