Fain Environmental and Impact Design prepared a temporary stream diversion plan for the E. Smith Rd Pavement Rehabilitation Project. Our team prepared and provided a technical review for a Stream Diversion Plan for Granite on a short timeline. Fain Environmental completed an analysis of flow through the proposed pipe and informed Granite on minimum pipe size.
Roles
- TemporaryStream Diversion Plan
- Hydrologic Assessment
Service Areas